A new Science Classroom and much needed electrical improvements
An exciting renovation for the the students of St Solomon’s high school Ahmedabad, Multan. There was also the new and improved electrical and safety equipment, which have kept the community of St Solomon’s School busy in 2025.
As part of the transition process from elementary to high school, the school is required to have a functioning Science lab. This important addition to the school allows students to engage in hands on experiments, promotes curiosity and develops student problem solving skills.
Br Waseem, Principal of St Solomon’s
Construction and purchasing of equipment were part of the project plan and cost. Carefully selecting the equipment and purchasing all necessary educational resources were factored into the project. A large donation from St Michael’s College Adelaide made this project possible.
The other project overseen by Br Waseem was for the electrical backup system of the school. A new Lithium battery and a hybrid solar inverter were purchased and installed. The main wires changed and the old electrical meter was repaired to make it safe. This project was also funded by St Bede’s Mentone.
Br Waseem, staff and students share their thanks with all those who donated and assisted with fundraising to make these changes to the educational environment of St Solomon’s possible.